Building owner: | Q-Park Ltd, Leeds |
Client: |
Vollack Parkhaus AG
Karlsruhe, Germany |
Architect: |
Potter & Holmes, London
Dipl.-Ing. (FH) P. Schumacher, Vollack |
Chartered Engineer: |
Roger Gray
www.muir-associates.co.uk |
Manufacturer: | N.N. |
Length: | app. 200 m |
Widht: | app. 65 m |
Height: | 4 storeys in non-public area, 3 storeys in public area |
Material: | S 235, S 355 (EN 10025) |
Year of construction: | 2006 |
Scope of Services: Structural analysis for steel components and floor sheeting
Hot design of floor-slabs (predesign) Structural Analysis Release 4: 2006-06-06 |